Tuesday, 25 April 2017

Filming Diary

Day One: Today we filmed quite a few shots without too many problems or issues. However the main issue we had whilst filming today was that people were talking outside of the shot (as we were in a public area. Because of this, we may have to either cut the sound out whilst editing and replace it with different audio, or we even re-shoot those shots.

Day 2; Today we re-shot most of the shots from day one as after viewing them, we noticed the sound in the background was evidently distracting from our actual product, and needed to be replaced. However today we were successful in replacing these shots as there were few people present, and when people did enter our shooting area, we just halted filming until it was clear.


Day 3: Unfortunately it began to rain heavily whilst we were shooting our product. This occurred fairly early into our filming, therefore at risk of the equipment suffering any water damage, we decided to pack up after a few shots and head back to school.


Day 4: Today was a very successful day of filming as the weather was pretty dry, which enabled us to stay out for a lengthy amount of time to complete almost of the shots required for our opening scene. The only issue we encountered was that we had the re-shoot the material form the previous rainy day as the quality of sound was poor.


Day 5: This was our final day of filming. We have had to use a different camera for filming our last few shots which initially caused a bit of confusion as to where our previous shots were. However after we had recovered those previous shots we were able to go out and complete of product. Due to the weather being quite pleasant, there was more people present in the surroundings areas where we were filming, however the sound isn't very noticeable and can easily be edited out.